LinkLinks WTOP: Track work guide: Yellow Line shutdown from Nov. 26 to Dec. 9 By Editor On Nov 25, 2018 65 Share WASHINGTON — Metro’s Yellow Line falls off the map for two weeks starting the Monday after Thanksgiving (Nov. 26) as the transit agency shuts down the bridge over the Potomac River for repairs. Washington Metropolitan Area Transit Authority 65 Share FacebookTwitterReddItWhatsAppEmailPrint
Comments are closed.